Differences between revisions 5 and 12 (spanning 7 versions)
Revision 5 as of 2009-07-29 00:04:54
Size: 988
Editor: AndreDeHon
Comment:
Revision 12 as of 2010-03-02 23:14:34
Size: 1239
Editor: AndreDeHon
Comment: link life critical
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
    * [[attachment:consumer_challenge.pdf|Report]]
Line 12: Line 13:
    * [[Challenges/Infrastructure|Draft Report]]
Line 13: Line 15:
    * ''likely defer to October meeting''     * Lead by: Mark Porter
    * [[attachment:lifecritical_challenge.pdf|Report]]
Line 16: Line 19:
    * [[attachment:aerospace_challenge.pdf|Report]]
Line 17: Line 21:
    * Lead by (now): Armando Fox (UCB)and Greg Bronevetsky (LLNL)     * Lead by (now): Armando Fox (UCB) and Greg Bronevetsky (LLNL)
Line 19: Line 23:
    * [[attachment:largescale_challenge.pdf|Report]]

Challenges

See the draft charge template for the challenge groups.

Constituency Groups

We are dividing up and defining the challenge by major constituency groups that may have widely different needs. As the groups refine their challenge articulation, we can identify commonality.

  • Commercial and Consumer Electronics (e.g. laptops, cell phones, gaming, mp3, DVR)
  • Infrastructure (e.g. Networking, telephony, building control, Smart Grid)
  • Life Critical (e.g. Automotive, Medical)
  • Space/Avionics (e.g. Airplanes, Satellites)
    • Contact: Heather Quinn
    • Report

  • Large-Scale Systems (e.g. Supercomputers, Data Centers)
    • Lead by (now): Armando Fox (UCB) and Greg Bronevetsky (LLNL)
    • Lead by (originally): Sarah Michalak (LANL)
    • Report

Challenges (last edited 2010-03-02 23:14:34 by AndreDeHon)