Differences between revisions 4 and 5
Revision 4 as of 2009-07-29 00:02:44
Size: 926
Editor: AndreDeHon
Comment:
Revision 5 as of 2009-07-29 00:04:54
Size: 988
Editor: AndreDeHon
Comment:
Deletions are marked like this. Additions are marked like this.
Line 17: Line 17:
    * Lead by: Sarah Michalak (LANL), Armando Fox (UCB)     * Lead by (now): Armando Fox (UCB)and Greg Bronevetsky (LLNL)
    * Lead by (originally): Sarah Michalak (LANL)

Challenges

See the draft charge template for the challenge groups.

Constituency Groups

We are dividing up and defining the challenge by major constituency groups that may have widely different needs. As the groups refine their challenge articulation, we can identify commonality.

  • Commercial and Consumer Electronics (e.g. laptops, cell phones, gaming, mp3, DVR)
  • Infrastructure (e.g. Networking, telephony, building control, Smart Grid)
  • Life Critical (e.g. Automotive, Medical)
    • likely defer to October meeting

  • Space/Avionics (e.g. Airplanes, Satellites)
    • Contact: Heather Quinn
  • Large-Scale Systems (e.g. Supercomputers, Data Centers)
    • Lead by (now): Armando Fox (UCB)and Greg Bronevetsky (LLNL)
    • Lead by (originally): Sarah Michalak (LANL)

Challenges (last edited 2010-03-02 23:14:34 by AndreDeHon)