Differences between revisions 2 and 3
Revision 2 as of 2009-05-26 15:36:24
Size: 755
Editor: AndreDeHon
Comment:
Revision 3 as of 2009-06-05 21:34:13
Size: 871
Editor: AndreDeHon
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
    * ''likely defer to October meeting''
Line 12: Line 13:
    * ''likely defer to October meeting''
Line 13: Line 15:
    * Contact: Heather Quinn

Challenges

See the draft charge template for the challenge groups.

Constituency Groups

We are dividing up and defining the challenge by major constituency groups that may have widely different needs. As the groups refine their challenge articulation, we can identify commonality.

  • Commercial and Consumer Electronics (e.g. laptops, cell phones, gaming, mp3, DVR)
  • Infrastructure (e.g. Networking, telephony, building control, Smart Grid)
    • likely defer to October meeting

  • Life Critical (e.g. Automotive, Medical)
    • likely defer to October meeting

  • Space/Avionics (e.g. Airplanes, Satellites)
    • Contact: Heather Quinn
  • Large-Scale Systems (e.g. Supercomputers, Data Centers)
    • Lead by: Sarah Michalak (LANL)

Challenges (last edited 2010-03-02 23:14:34 by AndreDeHon)